STEVEDORING TARIFFS (Taxes not included) Valid from 27th May 2005 |
DIT | |||
BOARD TARIFF |
20' | 40' | Unit | |
1 | Loading/Unloading operations | |||
Basic rate
|
34 € 45 € |
51 € 67,5 € |
Per Box Per Box |
|
Gantry crane dues
|
27 € 27 € |
41 € 41 € |
Per Box Per Box |
|
Traffic dues
|
4 € 7 € |
6 € 10 € |
Per Box Per Box |
|
2 | Shifting (same ship) | |||
Board/Board Basic rate
|
38 € 64 € |
57 € 96 € |
Per Box Per Box |
|
Gantry crane dues
|
24 € 24 € |
36 € 36 € |
Per Box Per Box |
|
Board/Shore/Board Basic rate
|
56 € 94 € |
84 € 141 € |
Per Box Per Box |
|
Gantry crane dues
|
24 € 24 € |
36 € 36 € |
Per Box Per Box |
|
3 | Transhipment lumpsum (ship to ship) | |||
|
130 € 180 € |
195 € 270 € |
Per Box Per Box |
|
4 | Reefer connection's on board | 8 € | Per Box | |
5 | Stuffing / Unstuffing | 7 € | Per ton | |
6 | Vehicles (Cbm) | 1,2 € | Per cubic meter | |
7 | Sawn Timbers (Ton) | 5 € | Per ton | |
8 | Divers conventionnel roro (Ton) | 4 € | Per ton | |
9 | Unloading full Bolsters (Unit) | 45 € | Per Bolster | |
10 | Unloading empty Bolsters (Unit) | 9 € | Per Bolster | |
11 | Gantry crane rental (Hour) | 621 € | Per indivisible hour |
STEVEDORING TARIFFS (Taxes not included) Valid from 27th May 2005 |
||||
SHORE HANDLING TARIFF | 20' (Fcfa) |
40' (Fcfa) |
Unit | |
1 | Stevedoring | |||
Empty (at Owner's charge)
|
8 000 8 000 |
16 000 16 000 |
Per Box Per Box |
|
Import full
|
50 000 90 000 |
41 € 41 € |
Per Box Per Box |
|
Export full
|
31 000 35 000 49 0007 |
59 000 70 000 98 000 |
Per box Per box Per box |
|
2 | Lifting on Trucks | 44 000 | 88 000 | Per full box |
3 | Demurrage | 44 000 | 88 000 | Per full box |
Export Full and empty boxes
|
300 3 000 10 000 |
450 4 500 15 000 |
Per box and Per day | |
Import full and empty box
|
600 2 400 7 200 12 000 |
1 200 4 800 14 400 24 000 |
Per box and Per day | |
4 | Reefers connection | 10 000 | 10 000 | Per box per day |
5 | Customs visit & Others | 87 000 | 150 000 | Box/visit |
6 | Sawn timbers | 2 800 | Per ton | |
7 | Vehicles (Volume) | Per cubic meter | ||
|
76 750 227 000 460 500 +3 000 |
Per vehicle Per vehicle Per vehicle For each additional CBM above 100 m 3 |
TERMINAL CAPACITY AND EQUIPMENTS |