4) TERMINAL PARTICULARS AND RESTRICTION |
|
| - |
Tanker Dead Weight: Minimum 50 000 Ts - Maximum 322 000 Ts |
| - |
Distance Bow to Manifold: Minimum 104 m - Maximum 104 m |
| - |
Hose connection Manifold must be fitted with at least 1 (one) flange of 16" 150 ASA |
| - |
Safe Weight Load (SWL) of the port side derrick of crane must be at least: |
| |
10 mts Minimum for tanker up to 80 000 mts SDWT |
| |
15 mts for tankers more than 80 000 mts SDWT |
| - |
Lifting tanker must have on the forepart deck a 3" chain stopper |
| - |
Water depth is about 55 meters in the vicinity of the loading buoy |
| - |
Vessels Oil-Bulk-ORE (OBO) of more than 10 (Ten) years old are prohibited. |
|
| |
| CERTIFICATES REQUIRED ON ARRIVAL |
| - |
Certificates Quality Vessel, with company, place and date of issue |
| - |
Ship Security Certificate |
| - |
Certificate of Tanker Safety Management. |
|
| |
|
|
|
The offshore Manager may refuse, on advise of the pilot or the mooring master, access of the vessel to the Terminal in the following cases but not limited to :
|
| |
| - |
Bad weather conditions |
| - |
Ship insufficiently equipped or with defective equipment |
| - |
Dirty ballast. |
|
| |
Night Movements
Berthing at the loading buoy is only done with daylight: 06:00 am to 16:00 pm local time sailing possible at night.
|
| |
Loading Rate
2 different crude grade available
Kole crude oil: About 30.5° API ---- 5 500 m3 or 34 600 bbl per hour
Lokele crude oil: About 24.5° API ---- 4 800 m3 or 30 200 bbl per hour
|
| |
Terminal Charges
For berthing, loading, hose connection and disconnection, personnel and official transfer.
Terminal charging for all services a lumpsum of 140 000 USD
In addition to above, Vessel will pay other charges by Port Authorities such as port dues, pilot charges and fees.
|